Description
The property is located at the Gödöllő exit of the busy M3 motorway with excellent visibility from both directions. It was built in 1996 and occupied by the Japanese SONY until 2010 as an electronics factory. Since then, the property has been used by multiple tenants for a combination of light production, storage and office functions.
Key Facts
- Built in 1996 as steel frame structure.
- Metal trapezoid sheets roofing with heat insulation and PVC membrane water insulation.
- Raster size: 10x25 meters pillar distance.
- Clear internal height is 4.6 meters.
- Public utility supplies: 3333 kVA electric power, 150 m3/day water and sewage capacity, 200 m3/hour gas capacity.
- Fire sprinkler system available with 250 m3 fire water tank.
- Over 200 car parks available in the yard.
- Industrial zoning of "Gip-01" which allows max. 45% build-up ratio, 10.5 meters building height, min. 25% green area.
- Building permit received in March 2023 for total 15,503 sqm warehouse space to be built in 2 phases. Permit is valid for 4 years.
Main Figures
- Land size: 108,135 sqm
- Building size: 21,360 sqm
- Tent size: 3,000 sqm