CGL Zeran Park
|
|
LocationThe property is a functional complex of building included the five warehouse buildings with integral office and social part. Additionally complex included one single office building with GLA 5691sqm. The park is located in Warsaw, Białołęka District, north part of Warsaw, approximately 12 km to the north-east of the city center of Warsaw. The property is located 2.5 km to the north from the S8 expressway which allows easy connection with Białystok to the north-east and Wroclaw to the south-west.The subject property is built-up with 6 warehouse-service-production buildings with office part and one office building as follows:. Key FactsNORD POINT ANNOPOL 17:
- The main function is office
- The GLA - 5,691.00 sqm
- The building is 5 floors office building and underground garage.
- The building was developed in 2014.
ANNOPOL 17A:
- The main function is storage
- The GLA - 12,103.00 sqm
- The building consists of one floor with no underground floors, its shape is similar to rectangle.
- Building is equipped with 16 loading docks and 14 gates accessible from ground level.
- The clear height in the highest point of the warehouse hall amounts to 10,5 m.
- The building was developed in 2011.
ANNOPOL 19:
- The main function is storage
- The GLA - 9,722.00 sqm
- The building consists of one floor with no underground floors, its shape is similar to rectangle.
- The warehouse area is not divided. Building is equipped with 27 loading docks and 9 gates accessible from ground level.
- The clear height in the highest point of the warehouse hall amounts to 7 m.
- The building was developed in 2007.
ANNOPOL 21:
- The main function is storage
- The GLA - 8,840.00 sqm
- The building consists of one floor with no underground floors, its shape is similar to rectangle.
- The warehouse area is not divided. Building is equipped with 5 loading docks and 6 gates accessible from ground level.
- The clear height in the highest point of the warehouse hall amounts to 10 m.
- The building was developed in 2009.
ANNOPOL 24/24A:
- The main function is storage
- The GLA - 17,289.00 sqm
- The building consists of one floor with no underground floors, its shape is similar to rectangle.
- The warehouse area is not divided. Building is equipped with 2 loading docks and 14 gates accessible from ground level.
- The clear height in the highest point of the warehouse hall amounts to 10 m
- The building was developed in 2006.
ANNOPOL 24B:
- The main function is storage, currently used as go-kart track
- The GLA – 5,678.0000 sqm
- The building consists of one floor with no underground floors, its shape is similar to rectangle.
- The warehouse area is not divided. Building is equipped with 4 gates accessible from ground level.
- The clear height in the highest point of the warehouse hall amounts to 10 m.
- The building was developed in 2007.
Location: https://maps.app.goo.gl/YJx9diLk5ZzUraSH6
Structure- Whole park plot size: 90,474.00sqm
- GLA: 44,423.00 sqm
- Warehouse units: 28,613.15 sqm
- Office and social unit: 15,809.85 sqm
|








